| No. |
Author |
Institution |
Title |
Date |
Download
 |
| 01 |
Rohrig, Scheibe |
ISET |
www.dispower.org Project Organisation System on Internet |
2003-06-23 |
 |
| 02 |
Rohrig, Ernst |
ISET, IT Power, Met |
Wind Power Prediction Tool successful adapted |
2003-08-29 |
 |
| 03 |
Degner, Strauss |
ISET, Uni Kassel |
Laboratory Grid for Distributed Generation |
2003-10-31 |
 |
| 04 |
Bossi, Bertani, Marcoli |
CESI |
The Distributed Power Generation Test Facility in CESI |
2003-10-31 |
 |
| 05 |
Belhomme, Bousseau |
EdF |
Wind Turbine Generator Models for simulation of power system dynamics with the EUROSTAG Software |
2003-11-12 |
 |
| 06 |
Buonarota |
CESI |
Energy Storage for Distributed Generation: SUMITOMO Vanadium Rodex Flow Battery (VRB) |
2003-12-04 |
 |
| 07 |
Buonarota |
CESI |
Energy Storage for Distributed Generation: URENCO (UPT) High Speed Flywheel |
2004-01-19 |
 |
| 08 |
Brignoli |
CESI |
CESI EuroDish solar generator - a new and alternative way to produce solar electricity at reduced scale |
2004-01-08 |
 |
| 09 |
Roggatz, Matics |
Dutrain, Uni Duisburg |
Operator Training for Distributed Generation |
2004-01-19 |
 |
| 10 |
Guastella |
CESI |
Renewable Energy Hybrid Systems: An Innovative Technology for Remote Electrification |
2004-03-15 |
 |
| 11 |
Hatziargyriou, Chanzy |
ICCS, Areva |
Integration of MORE CARE DG Management software with AREVA's eterra SCADA |
2004-05-04 |
 |
| 12 |
Nielsen, Ritter, Heier, Arnold, Valov |
EMD, Uni Kassel |
eGRID for WindPRO: New software tools for design and calculation of grids |
2004-10-18 |
 |
| 13 |
Mutale |
UMIST |
Development of Contract Structures for Ancillary Services from Distributed Generation |
2004-12-02 |
 |
| 14 |
Taisne |
Areva |
Wind Strategist - Integrating wind energy through the Balancing Market |
2004-12-07 |
 |
| 15 |
Bertani, Bisone |
CESI |
The Supervision System of the Distributed Power Generation Test Facility in CESI |
2005-02-27 |
 |
| 16 |
Perego, Belloni |
CESI |
The CESI cogeneration plant based on Turbec T100 microturbine CHP system |
2005-03-30 |
 |
| 17 |
Wasiak, Thoma, Foote |
TU Lodz, FhG-ISE, USTRAT |
A Power Quality Management Algorithm for Low Voltage Grids with Distributed Resources |
2005-06-13 |
 |
| 18 |
Micolano |
CESI
| Energy Storage for Distributed Generation ZEBRAIM Battery for stationary applications |
2005-06-17 |
 |
| 19 |
Oyarzabal |
Labein |
Advanced Power Plant Scheduling: Economic and Emission Dispatch (E&EmD) Problem Solution by Genetic Algorithms |
2005-07-25 |
 |
| 20 |
White |
Econnect |
Development of a Distributed Intelligent Load Controller |
2005-07-25 |
 |
| 21 |
Navarro, Bruendlinger, Rodriguez |
Iberdrola, Arsenal, Labein |
Grid interconnection of DG in Europe: Current requirements and recommendations for future activities |
2005-10-20 |
 |
| 22 |
Erge |
FhG-ISE |
Monitoring Concept for Low Voltage Electricity Grids with Distributed Generation |
2005-10-12 |
 |
| 23 |
Hicks, Saint-Drenan |
IT Power, ISET |
Wind power forecast for the UK BETTA electricity trading market |
2005-10-24 |
 |
| 24 |
Brignoli |
CESI |
CESI ORC Biomass CHP generator SBTG |
2005-10-19 |
 |
| 25 |
Scheepers |
ECN |
The Changing Role of Distribution System Operators in Liberalised and Decentralising Electricity Markets |
2005-10-14 |
 |
| 26 |
Tselepis, Neris, White |
CRES, Econnect |
CRES Hybrid Power Plant Test Facility and Implementation of Distributed Intelligent Load Controllers |
2005-10-25 |
 |
| 27 |
Tselepis, Neris, White |
CRES |
Interconnection of Solar Powered Mini-Grids to the Main Island of Kythnos |
2005-10-21 |
 |
| 28 |
Bründlinger, White |
Arsenal, Econnect |
Unintentional Islanding in Distribution Systems with DG |
2005-10-21 |
 |
| 29 |
Bletterie |
Arsenal |
Impact of network disturbances on inverter-based DG: Solutions for increased reliability |
2005-10-21 |
 |
| 30 |
Elmasidis, Demirtzi |
Germanos |
Design, development and testing of a lead-acid battery for short-term storage applications |
2005-10-24 |
 |
| 31 |
Materazzi, Belhomme, Badelin, Lefebvre, Navarro |
VPL, EdF, ISET, Vergnet, Iberdrola |
Study on the Implementation of DG in Europe up to the year 2030 |
2005-10-25 |
 |
| 32 |
Materazzi-Wagner |
VPL |
Planning Concept for the Implementation of DG in an Alpine Valley |
2005-10-25 |
 |
| 33 |
Belhomme |
EdF |
Distributed generation on European islands and weak grids: case studies |
2005-10-24 |
 |
| 34 |
Belhomme, Bousseau |
EdF |
Study on high penetration of wind energy on the French interconnected network |
2005-10-26 |
 |
| 35 |
Belmans, Driesen, Green |
KUL, IC |
Power Quality Improvement using Inverter-Interfaced Distributed Generators |
2005-10-26 |
 |
| 36 |
Chocarro, Navarro |
CEHN, Iberdrola |
Distributed Generation in Spain: Impact on Distribution System and Ancillary Services Provision |
2005-12-01 |
 |