Print-Qualität
Back to overview

Go to the next slide,

to the previous slide

Click on the slide to get it in print quality within a new screen.

Now let us consider we produce the equivalent of the demand from wind Energy.
For the demand in EU & Norway we need to install 660 GW within all regions.

First there is the Duration curve of the demand printed on the slide. It represents a total rated power of 465 GW and a demand of 1940 TWh.
The maximum power demand is 295 GW the minimum about 140 GW.